Benefit Transfer
1 useTransferring valuation estimates from existing literature.
Wetland • Northern Province
Total Estimated Value (TEV) RWF 394,960,000,000 Updated 2024 Reference-aligned
High-altitude peat bog feeding Ntaruka and Mukungwa hydropower plants; major carbon sink and Ramsar site.
All values derived from transparent, deterministic formulas—click "Methodology & sources" on any service row to inspect inputs, prices, and references.
Live InVEST Model Results • Last updated: 2026-01-09T21:10:20.474220
| Service | Methodology | Annual Value | Stock Value | Description / Notes |
|---|---|---|---|---|
| Income Generation | Market Price Method | 0.000 billion USD | — | Crafts, Guiding |
| Domestic Water | Replacement Cost Method | 0.000 billion USD | — | Domestic Water Value |
| Water Regulation | InVEST Water Yield Model | 0.047 billion USD | — | Annual water yield (0.423 USD/m³) |
| Carbon Storage | InVEST Carbon Model | 0.269 billion USD | 13.447 billion USD | Carbon stock (29.231 USD/tonne) |
| Soil Erosion Control | InVEST SDR Model | 0.012 billion USD | — | Sediment export (9.231 USD/tonne) |
Methods & evidence
Benefit Transfer
1 useTransferring valuation estimates from existing literature.
Market Price Method
1 useReplacement Cost Method
2 usesTravel Cost Method
1 useMethod reference
5 usesStabilizes dry-season flow to Ntaruka (11.25 MW) and Mukungwa (12 MW) hydropower plants.
Primary evidence reference pending.
Service-level data sources will appear here once tagged.
Additional notes available inside the data room export.